bridge
Wtirtsilti Delivers Advanced Icebreaker To Finnish Board Of Navigation
The icebreaker Otso (shown), ordered in March 1984 by the Finnish Board of Navigation, was delivered recently by Wartsila's Helsinki Shipyard. She is the first of two technologically advanced icebreakers of a new type. The second vessel was ordered
Repair Market Gains Muscle
Shipyards around the world are facing increasingly stringent environmental rules and regulations, adding additional expense to a business sector with an already reputed thin bottom line. Nonetheless, to stay in business shipyards must continuously enhance their capabilities and compliance,
Bel-Aire Yard To Build Two Tuna Seiners At Total Cost Of $20 Million
Bel-Aire Shipyard Ltd. of North Vancouver, British Columbia, Canada, has received a $20- million contract from Atunera Coinseco S.P.A. de C.V. of Mexico City, Mexico, to build two tuna seiners. The vessels are Canadiandesigned by naval a r c h i t e c ts Cleaver & Walkingshaw Ltd.
Literature Available On Galbraith-Pilot Marine Packaged System Concept
A colorful brochure describing the new Galbraith-Pilot Marine "Packaged System Concept" in Marine Diesel Engine Automation Systems for ACC & ACCU operations is available from Marine Electric RPD Inc. The Galbraith-Pilot Marine Automation Systems